Project NameNew Intermodal Center
Project LocationHingham, MA
Contract NumberS03CN03
Class7 - BUILDINGS
Project Value$6,286,080.00
DBE Goal17%

Scope of Work

Work consists of: construction of a two story intermodal transportation center at 45 Shipyard Drive in Hingham MA. The new intermodal building is approximately 8,400 square feet in area. The project also includes site improvements and utility work. Please note this contract will require the bidder to prepare both a paper copy as well as an electronic form bid. Please refer to Section 00200, Paragraph 1.5.E. Bid Submission Format.

Note: Contract specifications and drawings are available for download from an MBTA FTP site, or on CD via Fed Ex delivery.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.

Send Sealed Bids to:

All bids must be submitted electronically at: www.Bidx.com

Bids Must Be Received By: 9/26/2013 At 2:00 PM

Immediately thereafter, in a designated room, the Bids will be opened and read publicly.

Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:

Project ManagerReta Barasch
500 Arborway, Jamaica Plain, MA 02130
Telephone Number617-222-3360
Site Tour Date & Time*August 05, 2013 at 10:00 AM
Site Tour LocationDCR Building 45 at 26 Shipyard Drive (formerly known as 349 Lincoln Street) in Hingham, MA
Pre-Bid Meeting Date & Time **August 05, 2013 at 10:00 AM
Pre-Bid Meeting LocationDCR Building 45 at 26 Shipyard Drive (formerly known as 349 Lincoln Street) in Hingham, MA
Documents AvailableJuly 29, 2013

*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.

By:

Beverly Scott
General Manager

Richard A. Davey
MassDOT Secretary & CEO