Skip to main content
alert
Service Change Ongoing
MBTA service levels have been increased in the interest of the health and safety of our riders and employees. All riders must use face coverings when on the MBTA. More: MBTA.com/coronavirus

Rail Bridge Replacements

A rendering shows how a new bridge over Intervale Road in Weston will look upon completion
A rendering of the proposed changes to the Intervale Road Bridge on the Framingham/Worcester Line of the Commuter Rail

We’re replacing 6 bridges on various Commuter Rail lines as part of our work to modernize the system and make it safer for riders. These bridges were built in the early 1900s, and replacement is necessary to extend their service life and bring them into a state of good repair.

  • Contract awarded: May 21, 2019
  • Budget: $91 million (total cost for 6 bridge replacements, including others in Lawrence, Lynn, Melrose, Somerville, and Weston)
  • Status: Site preparations necessary for design start in fall 2019

Between 2020 and 2023, we'll replace the following bridges, with construction expected to start in this order:

Building a Better T

As part of our $8 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.

Learn more

Why These Bridges Are Part of the Same Project

We’re using a design-build contracting method for the 6 bridge replacements that are part of the MBTA Rail Bridge Replacement Project, which will:

  • Reduce design and construction time
  • Improve communication between the contractor and designer
  • Provide a single point of responsibility for both the design and construction.
  • Promote collaboration between engineers, the contractor, and MBTA staff

Couldn't make a public meeting?

Watch recordings of our meetings held in early June:

Watch the Bacon St Bridge meeting

Watch the Intervale Rd Bridge meeting

Bacon Street Bridge

Pictured above is the current Bacon Street bridge juxtaposed with a rendering of proposed changes. Use the slider to see more or less of each photo


Project timeline: Fall 2019 – Summer 2022

We're replacing the bridge that carries the Framingham/Worcester Line over Bacon Street in Wellesley between Natick Center and Wellesley Square near Morses Pond.

Major construction is expected to start in spring 2020, and there will be at least 2 weekend shutdowns (from Friday night to Monday morning), likely in spring and summer 2021.

Intervale Road Bridge

Pictured above is the current Intervale bridge juxtaposed with a rendering of proposed changes. Use the slider to see more or less of each photo


Project timeline: Fall 2019 – Summer 2022

We’re replacing the bridge that carries the Framingham/Worcester Line over Intervale Road in Weston between Wellesley Farms and Auburndale near the Leo J. Martin Memorial Golf Course. 

Major construction is expected to start in spring 2020, and there will be at least 2 weekend shutdowns (from Friday night to Monday morning), likely in spring and summer 2021.

High Line Bridge

Pictured above are renderings of the current High Line bridge juxtaposed with proposed changes. Use the slider to see more or less of each photo


Project timeline: Fall 2019 – Summer 2023

We’re replacing the bridge that carries the Lowell Line over an access road, High Line, and the railroad yard in Somerville between North Station and West Medford.

Major construction is expected to start in spring 2020, and there will be at least 1 weekend shutdown (from Friday night to Monday morning), likely in fall 2021.

Parker Street Bridge

Pictured above is the current Parker Street bridge juxtaposed with a rendering of proposed changes. Use the slider to see more or less of each photo


Project timeline: Fall 2019 – Summer 2022

We’re replacing the bridge that carries the Haverhill Line over Parker Street in Lawrence near Lawrence Station

Major construction is expected to start in fall 2020, and there will be at least 2 weekend shutdowns (from Friday night to Monday morning), likely in summer and fall 2021.

Lynn Fells Parkway Bridge

Pictured above is the current Lynn Fells Parkway bridge juxtaposed with a rendering of proposed changes. Use the slider to see more or less of each photo


Project timeline: Fall 2019 – Summer 2022

We’re replacing the bridge that carries the Haverhill Line over Lynn Fells Parkway in Melrose between Melrose Cedar Park and Melrose Highlands.

Major construction is expected to start in spring 2021, and there will be at least 2 weekend shutdowns (from Friday night to Monday morning), likely in fall 2021.

Commercial Street Bridge

Pictured above is the current Commercial Street bridge juxtaposed with a rendering of proposed changes. Use the slider to see more or less of each photo


Project timeline: Fall 2019 – Summer 2022

We’re replacing the bridge that carries the Newburyport/Rockport Line over Commercial Street in Lynn between River Works and Lynn Station.

Major construction is expected to start in spring 2021, and there will be at least 2 weekend shutdowns (from Friday night to Monday morning), likely in summer and fall 2021.

Past Events

View all events

Downloads

We invite you to review documents and downloads related to the Rail Bridge Replacements project.

Board presentation (May 2019)

Building a Better T

As part of our $8 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.

Learn more

Couldn't make a public meeting?

Watch recordings of our meetings held in early June:

Watch the Bacon St Bridge meeting

Watch the Intervale Rd Bridge meeting