Green Line E branch: Delays of about 15 minutes due to a signal problem between East Somerville and Medford/Tufts. Trolleys may stand by at stations.
Station Issue
Ongoing
The two Arlington Station entrances adjacent to 350 Boylston St are temporarily closed due to construction. Riders can use the entrances across the street in front of 320 Boylston St.
Affected lines: Green Line B branch Green Line C branch Green Line D branch Green Line E branch